Showing posts with label Greater Anglia. Show all posts
Showing posts with label Greater Anglia. Show all posts

Monday, 5 March 2012

The first bad night,

Tonight gradually degenerated into one of those classic rolling shambles which characterized NXEA's running of the Greater Anglia franchise.

First up, an overhead line problem between Thorpe-le-Soken and Clacton  meant some Clacton trains were being cancelled while others were terminating at Thorpe.

This meant a backlog of Clacton, Chelmsford and Colchester passengers at Stratford. As a result, I gave the Braintree a miss and got the 1806 for Ipswich, which doesn't stop at Chelmsford. I could change at Witham. Good thinking; or so I thought.

As it happened it got worse. There were no spare seats, the bulk of the additional passengers seem to have been for Colchester.

Next, we were held at a red signal outside Shenfield because another train was having overhead line problems. These were obviously insurmountable because as we dragged into the station there was an empty Southend-bound Class 321 on the down main-line platform.  We had to use one of the Metro platforms to get through the station. However, the line controller, whoever they are, played a blinder. They simply replaced the knackered 321 with a Metro Class 315 which left Shenfield for Southend just before we were allowed to leave.

The 1806 tonight was scheduled to make an additional stop at Hatfield Peverel. As we left Hatfield, a berk who was standing across from me wearing a parka got his hood caught on the emergency alarm handle and managed to inadvertently pull it; the train slammed to a stop. It took another 15 minutes for the driver to arrive to reset it. Luckily we were in the front carriage of the train so it didn't take him as long to arrive as it could have.

We eventually pulled into Witham almost half-an-hour later than scheduled.

Fortunately, given the weather, the Braintree train arrived within 3 minutes. We finally got to Braintree around 15 minutes late.

Given the circumstances and the way events transpired, the evening was handled by GA far better than a similar set of cock-ups would have been managed by NXEA. 

Tuesday, 14 February 2012

New Company...

And so far so good.

National Express East Anglia (NXEA) left the Anglia rail franchise totally unlamented on 5 February.

The same day their successors, Greater Anglia (GA), took over there was heavy snow, over 8 inches fell in Braintree overnight.

The difference in attitude to this between the 2 companies was startling.

If NXEA had still been running the railway it was a given that not one train would have been run to Braintree all week. But GA not only ran trains to and from Braintree but they ran them all the way into Liverpool Street.

What cancellations there were all trains on other routes, and there weren't nearly as many of those as NXEA imposed in similar conditions at the end of 2010.

Moreover, the quality of the information that GA provide is an order of magnitude superior to what we came to expect from NXEA. They are still using email to provide information but they are at least sending these messages in time, messages from NXEA were regularly three-quarters of an hour and frequently over an hour late.

The high hopes I entertained for this franchise are so far (fingers crossed) being realised.

It's a good start, hopefully, they won't let their standards slip.